CDM Dutyholders and the Project Lifecycle

Client, designer, principal designer, principal contractor, contractor and worker duties from concept through handover.

Long-form learning
Concept to Risk to Memory to Check-up

How to prepare for the CITB MAP test

Build manager-level decisions around role, prevention, coordination, verification and learning rather than memorising isolated site rules.

Core concepts

Concept 1

CDM 2015 integrates health and safety from design and pre-construction planning through construction, use, maintenance and demolition.

Exam cue: Identify the project phase and number of contractors before assigning principal roles.

Concept 2

Clients make suitable management arrangements and appoint principal dutyholders where more than one contractor is involved.

Exam cue: Eliminate foreseeable risk through design and communicate significant residual risk.

Concept 3

Information flows through pre-construction information, the construction phase plan and the health and safety file as applicable.

Exam cue: Coordinate dutyholders instead of treating documents as the objective.

Risk pitfalls and guardrails

Assuming only notifiable projects are subject to CDM.

Guardrail: Do not solve a design, engineering or organisational failure only with a briefing, warning sign or PPE.

Appointing a principal designer or contractor without checking capability and resources.

Guardrail: Do not solve a design, engineering or organisational failure only with a briefing, warning sign or PPE.

Producing generic documents that do not manage the actual project.

Guardrail: Do not solve a design, engineering or organisational failure only with a briefing, warning sign or PPE.

Memory anchors

CDM Covers the Lifecycle

Manage foreseeable construction, use, maintenance and demolition risks from the start.

Client Makes Arrangements

Allow time and resources, provide information and ensure suitable management.

More Than One Contractor

The client appoints a principal designer and principal contractor in writing.

Design Out Risk

Designers eliminate foreseeable hazards and reduce or communicate what remains.

Plan, Manage, Monitor, Coordinate

Principal dutyholders control their respective pre-construction and construction phases.

Information Must Travel

Provide useful pre-construction information, a live construction plan and relevant health and safety file.

Checkpoint rule

Do the check-up only after you can summarize each concept in one sentence and identify one dangerous pitfall from memory.

Knowledge Check (after reading)

Short check-up to confirm understanding of this module.

Check-up Questions

1-2 question checkpoint

Next step personalized recommendations

What is Pass Harbor?

Completely free exam prep for 247 UK exams.

  • Practice questions
  • Flashcards
  • Study guides
  • Mock exams
  • No registration
  • No paywall
  • Start instantly
No more expensive exam prep. Quality study tools should be accessible to everyone.