Topic module

Demolition, Dismantling and Structural Alteration

Surveys, structural method and sequence, services and hazardous materials, exclusion, plant, dust and public protection.

Long-form learning
Concept to Risk to Memory to Check-up

How to prepare for the CITB MAP test

Build manager-level decisions around role, prevention, coordination, verification and learning rather than memorising isolated site rules.

Core concepts

Concept 1

Demolition and structural alteration need competent planning based on reliable structural, service and hazardous-material information.

Exam cue: Survey the structure and surroundings before choosing the demolition method.

Concept 2

The written arrangement defines sequence, temporary stability, plant, exclusion zones, falling material and emergency controls.

Exam cue: Isolate and prove services and maintain structural stability at every stage.

Concept 3

Premature collapse, work at height, asbestos, dust, noise, vibration, fire, plant and public interfaces are managed together.

Exam cue: Stop when the structure or materials differ from the plan.

Risk pitfalls and guardrails

Starting soft strip or structural removal before adequate surveys.

Guardrail: Do not solve a design, engineering or organisational failure only with a briefing, warning sign or PPE.

Changing sequence or removing a load-bearing element without engineering review.

Guardrail: Do not solve a design, engineering or organisational failure only with a briefing, warning sign or PPE.

Using an exclusion zone to excuse uncontrolled collapse or debris.

Guardrail: Do not solve a design, engineering or organisational failure only with a briefing, warning sign or PPE.

Memory anchors

Survey Before Sequence

Understand structure, condition, services, hazardous materials and neighbours.

Written Demolition Arrangement

Define a safe method and sequence before demolition or dismantling begins.

Stability at Every Stage

Control temporary and remaining structure as loads and supports change.

Isolate Services

Locate, disconnect, prove and manage all incoming and embedded services.

Exclude and Contain

Protect workers and the public from collapse, plant, debris, dust and flying material.

Unexpected Means Stop

Unplanned structure, movement or material requires competent reassessment.

Checkpoint rule

Do the check-up only after you can summarize each concept in one sentence and identify one dangerous pitfall from memory.

Knowledge Check (after reading)

Short check-up to confirm understanding of this module.

Check-up Questions

1-2 question checkpoint

Next step personalized recommendations

Continue learning

Move forward only after this module is stable.

What is Pass Harbor?

Completely free exam prep for 247 UK exams.

  • Practice questions
  • Flashcards
  • Study guides
  • Mock exams
  • No registration
  • No paywall
  • Start instantly
No more expensive exam prep. Quality study tools should be accessible to everyone.