Topic module

Secondary Ports, Clearance and Drying Heights

Applying secondary-port corrections and combining height of tide, charted depth, drying height, draught and margin for access decisions.

Long-form learning
Concept to Risk to Memory to Check-up

How to prepare for Yachtmaster Theory

Refresh source and compass discipline, master position and tidal calculations, then integrate electronic cross-checks, weather, IRPCS, publications, offshore passage planning and emergency judgement.

Core concepts

Concept 1

Secondary-port corrections are applied from the relevant standard-port relationship using the almanac's time and height instructions rather than a generic fixed offset.

Exam cue: Read the correct secondary-port column and identify whether correction is interpolated by range or time.

Concept 2

Depth of water is charted depth plus height of tide, while clearance over a drying feature uses height of tide minus the drying height.

Exam cue: Draw a vertical datum sketch before adding or subtracting heights.

Concept 3

Required height for access includes draught, squat or heel where relevant, wave and survey uncertainty, and the skipper's under-keel clearance policy.

Exam cue: Work backwards from required depth to earliest or latest safe access time where necessary.

Risk pitfalls and guardrails

Applying a time correction to height or a height correction to time.

Guardrail: Do not present the 601-item authoring target or internal study sections as an official RYA paper structure and do not treat shorebased study as evidence of practical Yachtmaster command competence.

Adding a drying height when it should be subtracted from the tide height.

Guardrail: Do not present the 601-item authoring target or internal study sections as an official RYA paper structure and do not treat shorebased study as evidence of practical Yachtmaster command competence.

Using still-water draught without operational clearance or dynamic effects.

Guardrail: Do not present the 601-item authoring target or internal study sections as an official RYA paper structure and do not treat shorebased study as evidence of practical Yachtmaster command competence.

Memory anchors

Standard Then Secondary

Derive the base prediction before applying the published correction.

Depth = Chart + Tide

For charted depths, add height of tide.

Cover = Tide - Drying

For drying features, subtract drying height.

Required = Draught + Margin

Access needs more than bare draught.

Draw the Datum

A quick vertical sketch prevents sign errors.

Checkpoint rule

Do the check-up only after you can summarize each concept in one sentence and identify one dangerous pitfall from memory.

Knowledge Check (after reading)

Short check-up to confirm understanding of this module.

Check-up Questions

1-2 question checkpoint

A secondary-port table gives HW time correction +20 min and LW time correction -10 min. Standard-port HW is 1200 and LW is 1800. What are the secondary-port times?

Standard-port HW height is 5.4 m and the secondary-port HW correction is -0.3 m. What is secondary HW height?

Answer all questions to submit.

Next step personalized recommendations

What is Pass Harbor?

Completely free exam prep for 247 UK exams.

  • Practice questions
  • Flashcards
  • Study guides
  • Mock exams
  • No registration
  • No paywall
  • Start instantly
No more expensive exam prep. Quality study tools should be accessible to everyone.