Lift Plan, Load Weight, Radius and Capacity

Check weight, configuration, boom length, radius, chart deductions, dynamic effects and change control before lifting.

Long-form learning
Concept to Risk to Memory to Check-up

How to study crane and rigging decisions

Practice like a lift supervisor: verify competent people, calculate the actual lift, protect the ground, inspect every lifting point, control the load path, stop for communication or weather failures, and document defects before the next shift inherits them.

Core concepts

Concept 1

Verify load weight from reliable documents, calculation or weighing, then compare total lifted weight with the crane chart.

Exam cue: verified load weight

Concept 2

Stop and recalculate capacity at the actual radius and configuration; revise the lift plan if margin or route changes.

Exam cue: radius change capacity

Concept 3

Include the load, hook block, spreader beam, slings, shackles and all below-hook gear in the calculation.

Exam cue: deduct rigging weight

Targeted study blocks

Simulation focus

Lift Plan, Load Weight, Radius and Capacity

Check weight, configuration, boom length, radius, chart deductions, dynamic effects and change control before lifting.

Risk pitfalls and guardrails

Treating verbal permission as written authorization.

Guardrail: Avoid verbal approval, copied readings, skipped isolation, and after-the-fact record traps.

Proceeding without recording readings, isolation, PPE, or exposure-control evidence.

Guardrail: Avoid verbal approval, copied readings, skipped isolation, and after-the-fact record traps.

Choosing a generic answer without checking state variation or the latest official notice.

Guardrail: Avoid verbal approval, copied readings, skipped isolation, and after-the-fact record traps.

Memory anchors

verified load weight

Verify load weight from reliable documents, calculation or weighing, then compare total lifted weight with the crane chart.

radius change capacity

Stop and recalculate capacity at the actual radius and configuration; revise the lift plan if margin or route changes.

deduct rigging weight

Include the load, hook block, spreader beam, slings, shackles and all below-hook gear in the calculation.

no side loading

Do not side-pull; free the load by approved means, confirm vertical lift conditions, then lift within the plan.

Official source check

Verify eligibility, forms, fees, validity, and safety requirements with State Factories Inspectorates / Directorate of Industrial Safety and Health / Sector skill and lifting-equipment safety authorities or the current state authority notice.

Stop-work cue

If identity, authorization, isolation, PPE, exposure limits, or emergency controls are unclear, stop work and escalate.

Record cue

Exam-safe answers protect written records, competent sign-off, instrument readings, and traceable corrections.

Shortcut trap

Fast results, verbal approval, copied certificates, and undocumented adjustments are common trap answers.

Checkpoint rule

Do the check-up only after you can summarize each concept in one sentence and identify one dangerous pitfall from memory.

Knowledge Check (after reading)

Short check-up to confirm understanding of this module.

Check-up Questions

1-2 question checkpoint

A load weighs 8.0 tonnes. The hook block weighs 0.6 tonne and the slings, shackles, and spreader weigh 0.4 tonne. What gross lifted load must be checked against crane capacity?

At the planned boom length and 12 m radius, the applicable chart capacity is 10.0 tonnes. The load is 9.5 tonnes and suspended accessories total 0.8 tonne. What does the calculation show?

Answer all questions to submit.

Next step personalized recommendations

What is Pass Harbor?

Completely free exam prep for 142 Indian exams.

  • Practice questions
  • Flashcards
  • Study guides
  • Mock exams
  • No registration
  • No paywall
  • Start instantly
No more expensive exam prep. Quality study tools should be accessible to everyone.